- 1. Neo-deterministic seismic hazard scenarios for India - a preventive tool for disaster mitigation
- (Publications)
- ... et al. (Adv Geophys 53:93–165, 2012), the NDSHA methodology evolved with respect to the original formulation used by Parvez et al. (Geophys J Int 155:489–508, 2003): the computer codes were improved to ...
- Created on 10 August 2017
- 2. Do CMIP5 simulations of Indian summer monsoon rainfall differ from those of CMIP3?
- (Publications)
- ... Project 5 (CMIP5) over CMIP3, a comparative study is performed with the original and statistically downscaled outputs of five General Circulation Models (GCMs). We observe that multi-model average of original ...
- Created on 04 November 2013
- 3. List of shorthlisted candidates for CSIR C-MMACS PhD program under AcSIR for August 2012 Session
- (AcSIR Notifications)
- ... bring with you one photocopy of each of the above documents to be submitted prior to the interview. We will retain these copies upon verification with the originals and originals will be returned to ...
- Created on 16 June 2012
- 4. Rule on monsoon forecasts to be eased
- (CSIR-4PI in the news)
- ... allow private organizations in the country— and not just the India Meteorological Department (IMD)— to issue monsoon forecasts Click here for the original article: http://www.livemint.com/2012/04/16173150/Rule-on-monsoon-forecasts-to-b.html ...
- Created on 15 June 2012
- 5. SGI Origin 3900
- (Present day Computing Environment)
- Hardware 32 nos. of MIPS R16000 CPU at 1 GHz clock speed 16 MB Secondary cache on each CPU 96 GB Main Memory 2 x 146 GB Disk Capacity 10/100/1000 Mbps Ethernet Interface Operating System 64-bit SGI Linux ...
- Created on 24 April 2012